Port profile · Maritime Radar

Port of Horta daily activity

Horta handled an estimated average of 172 t a day in the week ending 25 September 2026 (+526.6% year on year), with an average of 0 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Portugal · LOCODE PTHOR · Main cargo sectors: Mineral Products, Vegetable Products, Prepared Foodstuffs & Beverages

Data up to · 25 September 2026

7-day average · Estimated total volume

172 t

28-day average

107 t

Vs 28-day average

+61.4%

Year on year (same week)

+526.6%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container4193 t0 t
Dry bulk00 t0 t
General cargo72.6 kt201 t
Ro-Ro00 t0 t
Tanker20 t0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Ponta Delgada: 677 t/day estimated with HortaPonta DelgadaPraia da Vitoria: 275 t/day estimated with HortaPraia da VitoriaSines: 57 t/day estimated with HortaSinesLisboa: 11 t/day estimated with HortaLisboaLeixoes: 9 t/day estimated with HortaLeixoesPort of Saint John's: 3 t/day estimated with HortaPort of Saint John'sPalma de Mallorca: 3 t/day estimated with HortaPalma de MallorcaThamshamm: 2 t/day estimated with HortaThamshammCork: 2 t/day estimated with HortaCorkPort-De-Bouc: 1 t/day estimated with HortaPort-De-BoucFunchal, Madeira: 1 t/day estimated with HortaFunchal, MadeiraIJmuiden: 1 t/day estimated with HortaIJmuidenSaint John's: 0 t/day estimated with HortaSaint John'sLa Coruna: 0 t/day estimated with HortaLa CorunaHorta
click to enable scroll zoom · drag to pan

Full footprint: all 14 connections of Horta aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Ponta DelgadaPortugal1.1 days between calls
  2. 2.Praia da VitoriaPortugal0.7 days between calls
  3. 3.SinesPortugal4.2 days between calls
  4. 4.LeixoesPortugal9.0 days between calls
  5. 5.Port of Saint John'sAntigua and Barbuda8.8 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.Ponta DelgadaPortugal1.5 days between calls
  2. 2.Praia da VitoriaPortugal2.7 days between calls
  3. 3.LisboaPortugal9.1 days between calls
  4. 4.SinesPortugal4.1 days between calls
  5. 5.LeixoesPortugal3.2 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)