Port profile · Maritime Radar

Port of Gaogang daily activity

Gaogang handled an estimated average of 65 kt a day in the week ending 25 September 2026 (+40.9% year on year), with an average of 3 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
China · LOCODE CNGAO · Main cargo sectors: Mineral Products, Prepared Foodstuffs & Beverages, Wood & Wood Products

Data up to · 25 September 2026

7-day average · Estimated total volume

65 kt

28-day average

35 kt

Vs 28-day average

+87.2%

Year on year (same week)

+40.9%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container00 t0 t
Dry bulk31672 kt93 kt
General cargo510 kt12 kt
Ro-Ro00 t0 t
Tanker7188 kt2.2 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Shanghai: 34,145 t/day estimated with GaogangShanghaiJiangyin: 15,514 t/day estimated with GaogangJiangyinQinhuangdao: 12,269 t/day estimated with GaogangQinhuangdaoHuanghua: 11,450 t/day estimated with GaogangHuanghuaZhoushan: 7,809 t/day estimated with GaogangZhoushanShougang Jingtang: 7,554 t/day estimated with GaogangShougang JingtangTangshan (Jingtang): 5,442 t/day estimated with GaogangTangshan (Jingtang)Ningbo: 4,605 t/day estimated with GaogangNingboTianjin Xin Gang: 3,956 t/day estimated with GaogangTianjin Xin GangSuzhou (Taicang): 3,248 t/day estimated with GaogangSuzhou (Taicang)Dongjiakou: 1,840 t/day estimated with GaogangDongjiakouLanqiao Port: 1,417 t/day estimated with GaogangLanqiao PortZhanjiang: 1,231 t/day estimated with GaogangZhanjiangFangcheng: 929 t/day estimated with GaogangFangchengBayuquan: 914 t/day estimated with GaogangBayuquanFuzhou: 875 t/day estimated with GaogangFuzhouRizhao: 875 t/day estimated with GaogangRizhaoLongkou Gang: 749 t/day estimated with GaogangLongkou GangJinzhou: 742 t/day estimated with GaogangJinzhouTauranga: 715 t/day estimated with GaogangTaurangaQingdao Port: 706 t/day estimated with GaogangQingdao PortLianyungang: 613 t/day estimated with GaogangLianyungangNantong: 581 t/day estimated with GaogangNantongYingkou: 559 t/day estimated with GaogangYingkouQiwei: 523 t/day estimated with GaogangQiweiBasuo: 515 t/day estimated with GaogangBasuoZhouliwang: 498 t/day estimated with GaogangZhouliwangMarsden Point: 449 t/day estimated with GaogangMarsden PointIncheon: 349 t/day estimated with GaogangIncheonNanjing: 344 t/day estimated with GaogangNanjingSanshandaocun: 331 t/day estimated with GaogangSanshandaocunGourd Shanzui: 320 t/day estimated with GaogangGourd ShanzuiKuantan: 314 t/day estimated with GaogangKuantanDalian: 281 t/day estimated with GaogangDalianWeihai: 278 t/day estimated with GaogangWeihaiXiamen: 275 t/day estimated with GaogangXiamenZhuhai: 273 t/day estimated with GaogangZhuhaiPort Hedland: 256 t/day estimated with GaogangPort HedlandQinzhou: 247 t/day estimated with GaogangQinzhouPicton: 230 t/day estimated with GaogangPictonGuangzhou (Nansha): 225 t/day estimated with GaogangGuangzhou (Nansha)Wenzhou: 223 t/day estimated with GaogangWenzhouNewcastle: 198 t/day estimated with GaogangNewcastleNew Plymouth: 197 t/day estimated with GaogangNew PlymouthManila: 178 t/day estimated with GaogangManilaNakhodka: 167 t/day estimated with GaogangNakhodkaWeifang Port: 163 t/day estimated with GaogangWeifang PortKaohsiung: 161 t/day estimated with GaogangKaohsiungYantai: 159 t/day estimated with GaogangYantaiNapier: 159 t/day estimated with GaogangNapierXiagong: 154 t/day estimated with GaogangXiagongChangzhou: 139 t/day estimated with GaogangChangzhouGwangyang (Kwangyang): 135 t/day estimated with GaogangGwangyang (Kwangyang)Wellington: 135 t/day estimated with GaogangWellingtonDandong: 131 t/day estimated with GaogangDandongMontevideo: 116 t/day estimated with GaogangMontevideoCagayan de Oro: 112 t/day estimated with GaogangCagayan de OroXiuyu: 112 t/day estimated with GaogangXiuyuDung Quat: 111 t/day estimated with GaogangDung QuatSuzhou (Zhangjiagang): 110 t/day estimated with GaogangSuzhou (Zhangjiagang)Abbot Point: 108 t/day estimated with GaogangIloilo: 104 t/day estimated with GaogangKimbe: 97 t/day estimated with GaogangZhapu: 91 t/day estimated with GaogangVostochnyy: 89 t/day estimated with GaogangNoro: 87 t/day estimated with GaogangPenglai: 86 t/day estimated with GaogangLuanjiakou: 85 t/day estimated with GaogangGladstone: 85 t/day estimated with GaogangVanino: 82 t/day estimated with GaogangGunsan: 70 t/day estimated with GaogangSingapore: 65 t/day estimated with GaogangIndonesia Morowali Industrial Park: 64 t/day estimated with GaogangYangpu: 64 t/day estimated with GaogangDavao: 61 t/day estimated with GaogangVladivostok: 60 t/day estimated with GaogangLyttelton: 59 t/day estimated with GaogangTaichung: 57 t/day estimated with GaogangShanghai (Yangshan): 55 t/day estimated with GaogangHarbor Yeweiju: 54 t/day estimated with GaogangPyeongtaek: 51 t/day estimated with GaogangUlsan: 51 t/day estimated with GaogangDongguan: 51 t/day estimated with GaogangChaozhou: 50 t/day estimated with GaogangShekou (Shenzhen): 49 t/day estimated with GaogangGeneral Santos: 47 t/day estimated with GaogangRio Grande: 47 t/day estimated with GaogangBaltimore: 47 t/day estimated with GaogangPohang: 46 t/day estimated with GaogangChittagong: 45 t/day estimated with GaogangSurabaya: 45 t/day estimated with GaogangMailiao: 43 t/day estimated with GaogangTsukumi: 42 t/day estimated with GaogangChiwan: 42 t/day estimated with GaogangBurnie: 41 t/day estimated with GaogangOita: 41 t/day estimated with GaogangPort of Sohar: 41 t/day estimated with GaogangTaman: 41 t/day estimated with GaogangGuangxi Beibu Gulf Port: 41 t/day estimated with GaogangSuzhou (Changshu): 41 t/day estimated with GaogangTanjung Sangata: 39 t/day estimated with GaogangPort Klang: 39 t/day estimated with GaogangShantou: 38 t/day estimated with GaogangWakayama-Shimotsu: 37 t/day estimated with GaogangLumut: 36 t/day estimated with GaogangBatangas City: 36 t/day estimated with GaogangTanjung Pelepas: 36 t/day estimated with GaogangRichards Bay: 36 t/day estimated with GaogangShidao Newport: 36 t/day estimated with GaogangMuroran: 36 t/day estimated with GaogangHitachi: 35 t/day estimated with GaogangFukuyama: 35 t/day estimated with GaogangSusaki: 34 t/day estimated with GaogangBalikpapan: 34 t/day estimated with GaogangBusan: 32 t/day estimated with GaogangPorto De Suape: 32 t/day estimated with GaogangLuoyuan: 30 t/day estimated with GaogangGeraldton: 30 t/day estimated with GaogangLautoka: 30 t/day estimated with GaogangPort Adelaide: 30 t/day estimated with GaogangNacala: 29 t/day estimated with GaogangHay Point: 28 t/day estimated with GaogangDampier: 26 t/day estimated with GaogangTaipei: 26 t/day estimated with GaogangConstantza: 25 t/day estimated with GaogangSaigon: 24 t/day estimated with GaogangLagos: 24 t/day estimated with GaogangCai Mep: 24 t/day estimated with GaogangDonghae: 23 t/day estimated with GaogangWhyalla: 23 t/day estimated with GaogangTimaru: 23 t/day estimated with GaogangMundra: 23 t/day estimated with GaogangRabaul: 22 t/day estimated with GaogangTachibana: 22 t/day estimated with GaogangLongview: 21 t/day estimated with GaogangBanten: 21 t/day estimated with GaogangParadip: 21 t/day estimated with GaogangHachinohe: 21 t/day estimated with GaogangNouakchott: 21 t/day estimated with GaogangBandar Shahid Rajaee: 21 t/day estimated with GaogangDarwin: 21 t/day estimated with GaogangDafeng: 20 t/day estimated with GaogangCape Town: 20 t/day estimated with GaogangKalama: 19 t/day estimated with GaogangKashima-Ibaraki: 19 t/day estimated with GaogangJiaxing: 19 t/day estimated with GaogangShibushi: 18 t/day estimated with GaogangHong Kong: 18 t/day estimated with GaogangKemaman Harbor: 18 t/day estimated with GaogangKisarazu: 17 t/day estimated with GaogangAqaba: 17 t/day estimated with GaogangPanjang: 16 t/day estimated with GaogangKandla: 16 t/day estimated with GaogangBluff Harbor: 16 t/day estimated with GaogangGresik: 16 t/day estimated with GaogangTuban: 16 t/day estimated with GaogangLos Angeles-Long Beach: 16 t/day estimated with GaogangPenang: 16 t/day estimated with GaogangNoumea: 15 t/day estimated with GaogangKlaipeda: 15 t/day estimated with GaogangDhamra Port: 15 t/day estimated with GaogangBeihai: 15 t/day estimated with GaogangDurban: 15 t/day estimated with GaogangBuenaventura: 14 t/day estimated with GaogangKoolan: 14 t/day estimated with GaogangPort De Kribi: 14 t/day estimated with GaogangHobart: 14 t/day estimated with GaogangDa Nang: 14 t/day estimated with GaogangPelabuhanRatuCoalPowerPlant: 14 t/day estimated with GaogangKhalifa Port: 14 t/day estimated with GaogangCilacap: 14 t/day estimated with GaogangKeelung: 13 t/day estimated with GaogangHaldia: 13 t/day estimated with GaogangDaesan: 13 t/day estimated with GaogangShui Dong: 13 t/day estimated with GaogangBontang LNG Terminal: 12 t/day estimated with GaogangHaimen: 12 t/day estimated with GaogangStagen: 12 t/day estimated with GaogangRichmond, CA: 12 t/day estimated with GaogangHarmac: 11 t/day estimated with GaogangTacoma: 11 t/day estimated with GaogangBroome: 11 t/day estimated with GaogangNoshiro: 11 t/day estimated with GaogangAcajutla: 11 t/day estimated with GaogangGuangdong Yangjiang Port: 11 t/day estimated with GaogangPuerto Quetzal: 11 t/day estimated with GaogangParamaribo: 10 t/day estimated with GaogangOtago: 10 t/day estimated with GaogangTanjung Priok: 10 t/day estimated with GaogangVanimo: 9 t/day estimated with GaogangOnomichi-Itozaki: 9 t/day estimated with GaogangNghe Tinh: 9 t/day estimated with GaogangMackay: 9 t/day estimated with GaogangBarbor's Point: 9 t/day estimated with GaogangBarcelona: 8 t/day estimated with GaogangCartagena: 8 t/day estimated with GaogangPortland: 7 t/day estimated with GaogangJebel Ali: 7 t/day estimated with GaogangJinhae: 6 t/day estimated with GaogangNagoya: 6 t/day estimated with GaogangGaogang
click to enable scroll zoom · drag to pan

Full footprint: all 240 connections of Gaogang aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.ShanghaiChina8.3 days between calls
  2. 2.JiangyinChina8.7 days between calls
  3. 3.QinhuangdaoChina4.5 days between calls
  4. 4.HuanghuaChina5.6 days between calls
  5. 5.ZhoushanChina4.1 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.ShanghaiChina2.9 days between calls
  2. 2.QinhuangdaoChina6.5 days between calls
  3. 3.HuanghuaChina6.3 days between calls
  4. 4.Shougang JingtangChina6.0 days between calls
  5. 5.Tangshan (Jingtang)China6.0 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)