Port profile · Maritime Radar

Port of Chittagong daily activity

Chittagong handled an estimated average of 62 kt a day in the week ending 25 September 2026 (-8.8% year on year), with an average of 7 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Bangladesh · Main cargo sectors: Mineral Products, Vegetable Products, Textiles & Footwear

Data up to · 25 September 2026

7-day average · Estimated total volume

62 kt

28-day average

53 kt

Vs 28-day average

+18.4%

Year on year (same week)

-8.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container102657 kt15 kt
Dry bulk21408 kt7.8 kt
General cargo1449 kt7.9 kt
Ro-Ro21.8 kt80 t
Tanker31326 kt2.4 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Singapore: 21,863 t/day estimated with ChittagongSingaporePort Klang: 15,649 t/day estimated with ChittagongPort KlangColombo: 15,024 t/day estimated with ChittagongColomboTanjung Pelepas: 4,876 t/day estimated with ChittagongTanjung PelepasShanghai: 3,375 t/day estimated with ChittagongShanghaiPengerang: 1,519 t/day estimated with ChittagongPengerangTeluk Bayur: 1,284 t/day estimated with ChittagongTeluk BayurYangon: 881 t/day estimated with ChittagongYangonChennai (Madras): 777 t/day estimated with ChittagongChennai (Madras)Kandla: 737 t/day estimated with ChittagongKandlaNovorossiysk: 732 t/day estimated with ChittagongNovorossiyskPelabuhanRatuCoalPowerPlant: 702 t/day estimated with ChittagongPelabuhanRatuCoalPowerPlantVisakhapatnam: 678 t/day estimated with ChittagongVisakhapatnamMumbai-Jawaharlal Nehru (Nhava Sheva): 660 t/day estimated with ChittagongMumbai-Jawaharlal Nehru (Nhava Sheva)Fukuyama: 651 t/day estimated with ChittagongFukuyamaOakland: 640 t/day estimated with ChittagongOaklandTianjin Xin Gang: 619 t/day estimated with ChittagongTianjin Xin GangMawan: 526 t/day estimated with ChittagongMawanDumai: 512 t/day estimated with ChittagongDumaiKakinada: 492 t/day estimated with ChittagongKakinadaDhamra Port: 471 t/day estimated with ChittagongDhamra PortKrishnapatnam Port: 433 t/day estimated with ChittagongKrishnapatnam PortTacoma: 411 t/day estimated with ChittagongTacomaParadip: 408 t/day estimated with ChittagongParadipMongla: 395 t/day estimated with ChittagongMonglaKuantan: 386 t/day estimated with ChittagongKuantanKaohsiung: 382 t/day estimated with ChittagongKaohsiungJohor: 382 t/day estimated with ChittagongJohorHaldia: 381 t/day estimated with ChittagongHaldiaFujairah: 376 t/day estimated with ChittagongFujairahKashima-Ibaraki: 368 t/day estimated with ChittagongKashima-IbarakiSuzhou (Taicang): 360 t/day estimated with ChittagongSuzhou (Taicang)Mina Saqr: 351 t/day estimated with ChittagongMina SaqrNingbo: 328 t/day estimated with ChittagongNingboLos Angeles-Long Beach: 324 t/day estimated with ChittagongLos Angeles-Long BeachLumut: 317 t/day estimated with ChittagongLumutVancouver: 311 t/day estimated with ChittagongVancouverPenang: 306 t/day estimated with ChittagongPenangTaichung: 305 t/day estimated with ChittagongTaichungSaigon: 302 t/day estimated with ChittagongSaigonLanqiao Port: 297 t/day estimated with ChittagongLanqiao PortSerangoon Harbor: 285 t/day estimated with ChittagongSerangoon HarborKolkata (Syama Prasad Mookerje Port): 281 t/day estimated with ChittagongKolkata (Syama Prasad Mookerje Port)Auckland: 275 t/day estimated with ChittagongAucklandXiamen: 266 t/day estimated with ChittagongXiamenShougang Jingtang: 262 t/day estimated with ChittagongShougang JingtangBayuquan: 259 t/day estimated with ChittagongBayuquanRichmond, CA: 258 t/day estimated with ChittagongRichmond, CAKarachi: 254 t/day estimated with ChittagongKarachiNew Mangalore: 243 t/day estimated with ChittagongNew MangaloreKarimun: 241 t/day estimated with ChittagongKarimunDurban: 236 t/day estimated with ChittagongDurbanHong Kong: 235 t/day estimated with ChittagongHong KongBelawan: 233 t/day estimated with ChittagongBelawanCai Mep: 223 t/day estimated with ChittagongCai MepTuticorin: 220 t/day estimated with ChittagongTuticorinOita: 220 t/day estimated with ChittagongOitaRotterdam: 218 t/day estimated with ChittagongRotterdamYokohama: 198 t/day estimated with ChittagongYokohamaQiwei: 196 t/day estimated with ChittagongQiweiHuanghua: 188 t/day estimated with ChittagongFunabashi: 187 t/day estimated with ChittagongZhouliwang: 187 t/day estimated with ChittagongLiverpool: 184 t/day estimated with ChittagongKinuura: 183 t/day estimated with ChittagongDandong: 179 t/day estimated with ChittagongTokyo: 178 t/day estimated with ChittagongSharjah: 178 t/day estimated with ChittagongMizushima: 175 t/day estimated with ChittagongPyeongtaek: 173 t/day estimated with ChittagongLianyungang: 171 t/day estimated with ChittagongBrisbane: 170 t/day estimated with ChittagongMina Al Ahmadi: 169 t/day estimated with ChittagongSalalah: 165 t/day estimated with ChittagongFangcheng: 163 t/day estimated with ChittagongIshikariwan-Shinko: 160 t/day estimated with ChittagongJebel Ali: 157 t/day estimated with ChittagongRizhao: 152 t/day estimated with ChittagongXiagong: 150 t/day estimated with ChittagongQuanzhou: 144 t/day estimated with ChittagongTangshan (Jingtang): 141 t/day estimated with ChittagongDhaka: 141 t/day estimated with ChittagongLaem Chabang: 138 t/day estimated with ChittagongFremantle: 133 t/day estimated with ChittagongDoha-Umm Said: 133 t/day estimated with ChittagongLongview: 132 t/day estimated with ChittagongTanjung Priok: 126 t/day estimated with ChittagongZhanjiang: 125 t/day estimated with ChittagongHazira: 123 t/day estimated with ChittagongCat Lai (Saigon New Port): 120 t/day estimated with ChittagongCochin (Kochi): 118 t/day estimated with ChittagongKamarajar Port: 110 t/day estimated with ChittagongPelabuhan Sungai Udang: 106 t/day estimated with ChittagongHai Phong: 104 t/day estimated with ChittagongBarbor's Point: 104 t/day estimated with ChittagongBusan: 102 t/day estimated with ChittagongSikka: 102 t/day estimated with ChittagongKattupalli: 102 t/day estimated with ChittagongChiba: 101 t/day estimated with ChittagongMundra: 100 t/day estimated with ChittagongTilbury: 99 t/day estimated with ChittagongKawasaki: 97 t/day estimated with ChittagongKushiro: 97 t/day estimated with ChittagongTokuyama: 96 t/day estimated with ChittagongDongjiakou: 95 t/day estimated with ChittagongCasablanca: 95 t/day estimated with ChittagongDar Es Salaam: 95 t/day estimated with ChittagongYingkou: 94 t/day estimated with ChittagongNantong: 94 t/day estimated with ChittagongQingdao Port: 93 t/day estimated with ChittagongLongkou Gang: 91 t/day estimated with ChittagongLyttelton: 89 t/day estimated with ChittagongMap Ta Phut: 89 t/day estimated with ChittagongJubail: 88 t/day estimated with ChittagongPort Elizabeth: 88 t/day estimated with ChittagongRichards Bay: 87 t/day estimated with ChittagongPanjang: 86 t/day estimated with ChittagongSurabaya: 83 t/day estimated with ChittagongSiam Seaport: 81 t/day estimated with ChittagongDahej: 81 t/day estimated with ChittagongGuangzhou (Nansha): 79 t/day estimated with ChittagongAl Hamriyah LPG Terminal: 79 t/day estimated with ChittagongJiangyin: 77 t/day estimated with ChittagongCilacap: 76 t/day estimated with ChittagongQuequén: 75 t/day estimated with ChittagongGwangyang (Kwangyang): 74 t/day estimated with ChittagongStagen: 74 t/day estimated with ChittagongKhalifa Port: 73 t/day estimated with ChittagongDampier: 73 t/day estimated with ChittagongUlsan: 73 t/day estimated with ChittagongKemaman Harbor: 72 t/day estimated with ChittagongPort Hedland: 71 t/day estimated with ChittagongPortland, OR: 71 t/day estimated with ChittagongAbu Dhabi: 71 t/day estimated with ChittagongTynemouth: 70 t/day estimated with ChittagongQinzhou: 69 t/day estimated with ChittagongBangkok: 68 t/day estimated with ChittagongBintulu: 68 t/day estimated with ChittagongSuzhou (Zhangjiagang): 68 t/day estimated with ChittagongManila: 68 t/day estimated with ChittagongXiuyu: 66 t/day estimated with ChittagongDachan Bay: 64 t/day estimated with ChittagongBuchanan: 63 t/day estimated with ChittagongShantou: 62 t/day estimated with ChittagongPort De Kribi: 62 t/day estimated with ChittagongShuaiba: 62 t/day estimated with ChittagongTanjung Sekong: 61 t/day estimated with ChittagongZhoushan: 61 t/day estimated with ChittagongIncheon: 60 t/day estimated with ChittagongIstanbul: 59 t/day estimated with ChittagongAqaba: 59 t/day estimated with ChittagongDung Quat: 58 t/day estimated with ChittagongFuzhou: 58 t/day estimated with ChittagongGuangdong Yangjiang Port: 56 t/day estimated with ChittagongPort Adelaide: 56 t/day estimated with ChittagongPort Kembla: 55 t/day estimated with ChittagongBanten: 54 t/day estimated with ChittagongShekou (Shenzhen): 54 t/day estimated with ChittagongSuzhou (Changshu): 53 t/day estimated with ChittagongTownsville: 53 t/day estimated with ChittagongTomakomai: 53 t/day estimated with ChittagongVanino: 52 t/day estimated with ChittagongBeira: 52 t/day estimated with ChittagongDafeng: 51 t/day estimated with ChittagongDavao: 50 t/day estimated with ChittagongJiaxing: 50 t/day estimated with ChittagongLas Palmas (de Gran Canaria): 50 t/day estimated with ChittagongMaputo: 50 t/day estimated with ChittagongDammam: 48 t/day estimated with ChittagongPayra: 48 t/day estimated with ChittagongTaranto: 48 t/day estimated with ChittagongHambantota: 48 t/day estimated with ChittagongAmsterdam: 47 t/day estimated with ChittagongLuoyuan: 46 t/day estimated with ChittagongCape Town: 46 t/day estimated with ChittagongMormugao: 45 t/day estimated with ChittagongPivdennyi: 45 t/day estimated with ChittagongGaogang: 45 t/day estimated with ChittagongCalaca: 45 t/day estimated with ChittagongMuhammad Bin Qasim: 44 t/day estimated with ChittagongKhor Fakkan: 44 t/day estimated with ChittagongBatangas City: 42 t/day estimated with ChittagongPohang: 42 t/day estimated with ChittagongChangzhou: 41 t/day estimated with ChittagongDaesan: 40 t/day estimated with ChittagongYangpu: 39 t/day estimated with ChittagongWellington: 39 t/day estimated with ChittagongSekupang: 38 t/day estimated with ChittagongCotonou: 37 t/day estimated with ChittagongAlgeciras: 37 t/day estimated with ChittagongBalikpapan: 37 t/day estimated with ChittagongPort Blair: 36 t/day estimated with ChittagongMombasa: 36 t/day estimated with ChittagongMelbourne: 36 t/day estimated with ChittagongTanjunguban: 35 t/day estimated with ChittagongBurgas: 35 t/day estimated with ChittagongTsukumi: 35 t/day estimated with ChittagongUmm Qasr: 35 t/day estimated with ChittagongTuban: 33 t/day estimated with ChittagongSitrah: 33 t/day estimated with ChittagongChittagong
click to enable scroll zoom · drag to pan

Full footprint: all 418 connections of Chittagong aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.SingaporeSingapore8.0 days between calls
  2. 2.Port KlangMalaysia6.9 days between calls
  3. 3.ColomboSri Lanka6.9 days between calls
  4. 4.Tanjung PelepasMalaysia7.2 days between calls
  5. 5.ShanghaiChina16.5 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.SingaporeSingapore6.4 days between calls
  2. 2.ColomboSri Lanka5.3 days between calls
  3. 3.Port KlangMalaysia5.7 days between calls
  4. 4.Tanjung PelepasMalaysia7.0 days between calls
  5. 5.YangonMyanmar4.8 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)