Port profile · Maritime Radar

Port of Stigsnaes daily activity

Stigsnaes handled an estimated average of 4.5 kt a day in the week ending 25 September 2026 (+84.8% year on year), with an average of 0 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Denmark

Data up to · 25 September 2026

7-day average · Estimated total volume

4.5 kt

28-day average

3.4 kt

Vs 28-day average

+32.0%

Year on year (same week)

+84.8%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container13.0 kt0 t
Dry bulk00 t0 t
General cargo31.8 kt742 t
Ro-Ro00 t0 t
Tanker842 kt48 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Rotterdam: 790 t/day estimated with StigsnaesRotterdamUst-Luga: 656 t/day estimated with StigsnaesUst-LugaRichards Bay: 510 t/day estimated with StigsnaesRichards BaySlagentangen: 431 t/day estimated with StigsnaesSlagentangenLas Palmas (de Gran Canaria): 400 t/day estimated with StigsnaesLas Palmas (de Gran Canaria)Mongstad: 371 t/day estimated with StigsnaesMongstadHouston (US-TX): 360 t/day estimated with StigsnaesHouston (US-TX)Singapore: 330 t/day estimated with StigsnaesSingaporeBrofjorden: 312 t/day estimated with StigsnaesBrofjordenSkoldvik: 264 t/day estimated with StigsnaesSkoldvikEsbjerg: 245 t/day estimated with StigsnaesEsbjergAntwerp: 242 t/day estimated with StigsnaesAntwerpFerrol: 224 t/day estimated with StigsnaesFerrolGdynia: 168 t/day estimated with StigsnaesGdyniaAalborg: 152 t/day estimated with StigsnaesAalborgWilhelmshaven: 149 t/day estimated with StigsnaesWilhelmshavenSouth Louisiana: 145 t/day estimated with StigsnaesSouth LouisianaRiga: 144 t/day estimated with StigsnaesRigaKalundborg: 137 t/day estimated with StigsnaesKalundborgFredericia: 136 t/day estimated with StigsnaesFredericiaNew Orleans: 122 t/day estimated with StigsnaesNew OrleansTangier-Mediterranean: 115 t/day estimated with StigsnaesTangier-MediterraneanSaint Petersburg: 114 t/day estimated with StigsnaesSaint PetersburgSwinoujscie: 112 t/day estimated with StigsnaesSwinoujscieHamburg: 105 t/day estimated with StigsnaesHamburgGöteborg: 102 t/day estimated with StigsnaesGöteborgImmingham: 100 t/day estimated with StigsnaesImminghamMäntyluoto: 98 t/day estimated with StigsnaesMäntyluotoOslo: 97 t/day estimated with StigsnaesOsloFujairah: 95 t/day estimated with StigsnaesFujairahMuuga-Port of Tallinn: 92 t/day estimated with StigsnaesMuuga-Port of TallinnTangshan (Jingtang): 79 t/day estimated with StigsnaesTangshan (Jingtang)Sillamae: 78 t/day estimated with StigsnaesSillamaeKøbenhavn: 75 t/day estimated with StigsnaesKøbenhavnAmsterdam: 72 t/day estimated with StigsnaesAmsterdamMurmansk: 69 t/day estimated with StigsnaesMurmanskNew York-New Jersey: 67 t/day estimated with StigsnaesNew York-New JerseyOranjestad: 66 t/day estimated with StigsnaesOranjestadDelaware: 65 t/day estimated with StigsnaesDelawareVysotsk: 65 t/day estimated with StigsnaesVysotskFos: 61 t/day estimated with StigsnaesFosBrunsbuettel: 57 t/day estimated with StigsnaesBrunsbuettelSzczecin: 56 t/day estimated with StigsnaesSzczecinPort Arthur: 55 t/day estimated with StigsnaesPort ArthurAarhus: 53 t/day estimated with StigsnaesAarhusLe Havre: 53 t/day estimated with StigsnaesLe HavreBoston: 52 t/day estimated with StigsnaesBostonSikka: 51 t/day estimated with StigsnaesSikkaMilford Haven: 50 t/day estimated with StigsnaesMilford HavenNarvik: 49 t/day estimated with StigsnaesNarvikSayda: 49 t/day estimated with StigsnaesSaydaJabal Az Zannah-Ruways: 48 t/day estimated with StigsnaesJabal Az Zannah-RuwaysMadre De Deus: 45 t/day estimated with StigsnaesMadre De DeusBaltimore: 44 t/day estimated with StigsnaesBaltimoreGrenaa: 43 t/day estimated with StigsnaesGrenaaGdansk: 42 t/day estimated with StigsnaesGdanskSkikda (Port Methanier): 42 t/day estimated with StigsnaesSkikda (Port Methanier)Garston: 40 t/day estimated with StigsnaesGarstonTarbert: 39 t/day estimated with StigsnaesTarbertIJmuiden: 38 t/day estimated with StigsnaesIJmuidenDunkirk: 37 t/day estimated with StigsnaesFinnart Oil Terminal: 37 t/day estimated with StigsnaesSanta Cruz De Tenerife: 36 t/day estimated with StigsnaesTexas City: 36 t/day estimated with StigsnaesYanbu (King Fahd Port): 35 t/day estimated with StigsnaesCorpus Christi: 35 t/day estimated with StigsnaesAlgeciras: 35 t/day estimated with StigsnaesNgqura: 35 t/day estimated with StigsnaesTeesport: 35 t/day estimated with StigsnaesDubai: 34 t/day estimated with StigsnaesPascagoula: 33 t/day estimated with StigsnaesDublin: 32 t/day estimated with StigsnaesBilbao: 31 t/day estimated with StigsnaesNorrköping: 31 t/day estimated with StigsnaesJeddah: 31 t/day estimated with StigsnaesMarsaxlokk: 30 t/day estimated with StigsnaesDelta Terminal: 30 t/day estimated with StigsnaesBremen: 29 t/day estimated with StigsnaesSidi Kerir: 29 t/day estimated with StigsnaesFawley: 29 t/day estimated with StigsnaesPort Elizabeth: 27 t/day estimated with StigsnaesLa Coruna: 27 t/day estimated with StigsnaesMaputo: 26 t/day estimated with StigsnaesKokkola: 25 t/day estimated with StigsnaesStockholm: 25 t/day estimated with StigsnaesMontoir: 24 t/day estimated with StigsnaesLos Angeles-Long Beach: 24 t/day estimated with StigsnaesKandalaksha: 22 t/day estimated with StigsnaesVentspils: 20 t/day estimated with StigsnaesOdense: 20 t/day estimated with StigsnaesQuebec: 20 t/day estimated with StigsnaesNyborg: 19 t/day estimated with StigsnaesGävle: 19 t/day estimated with StigsnaesRostock: 19 t/day estimated with StigsnaesPorsgrunn: 18 t/day estimated with StigsnaesKlaipeda: 18 t/day estimated with StigsnaesInkoo: 17 t/day estimated with StigsnaesTrondheim: 16 t/day estimated with StigsnaesTaranto: 16 t/day estimated with StigsnaesStavanger: 15 t/day estimated with StigsnaesFredrikshamn: 15 t/day estimated with StigsnaesNouadhibou: 15 t/day estimated with StigsnaesGrangemouth: 15 t/day estimated with StigsnaesThyboron: 15 t/day estimated with StigsnaesBatumi: 14 t/day estimated with StigsnaesSkelleftehamn: 14 t/day estimated with StigsnaesNynäshamn: 14 t/day estimated with StigsnaesGravesend: 14 t/day estimated with StigsnaesFrederikshavn: 13 t/day estimated with StigsnaesMalmö: 13 t/day estimated with StigsnaesMarsa Tobruk: 13 t/day estimated with StigsnaesLa Pallice: 13 t/day estimated with StigsnaesÅbenrå: 12 t/day estimated with StigsnaesFredrikstad: 11 t/day estimated with StigsnaesSanta Panagia: 11 t/day estimated with StigsnaesHalmstad: 11 t/day estimated with StigsnaesHelsingborg: 10 t/day estimated with StigsnaesRanders: 10 t/day estimated with StigsnaesGhent: 9 t/day estimated with StigsnaesKolding: 9 t/day estimated with StigsnaesNaantali: 8 t/day estimated with StigsnaesPiteå: 8 t/day estimated with StigsnaesTerneuzen: 7 t/day estimated with StigsnaesKøge: 7 t/day estimated with StigsnaesRas Lanuf (Al Burayqah): 7 t/day estimated with StigsnaesBremerhaven: 7 t/day estimated with StigsnaesSines: 6 t/day estimated with StigsnaesHuelva: 5 t/day estimated with StigsnaesÅlesund: 5 t/day estimated with StigsnaesLubeck-Travemunde: 5 t/day estimated with StigsnaesKårstø: 5 t/day estimated with StigsnaesBrest: 5 t/day estimated with StigsnaesKiel: 5 t/day estimated with StigsnaesEmden: 5 t/day estimated with StigsnaesWismar: 5 t/day estimated with StigsnaesLiepaja: 5 t/day estimated with StigsnaesSkagen: 4 t/day estimated with StigsnaesVikanes: 4 t/day estimated with StigsnaesHirtshals: 4 t/day estimated with StigsnaesVaasa: 4 t/day estimated with StigsnaesDrammen: 4 t/day estimated with StigsnaesIpswich: 4 t/day estimated with StigsnaesFrederiksvaerk: 4 t/day estimated with StigsnaesFuglafjordur: 4 t/day estimated with StigsnaesOxelösund: 3 t/day estimated with StigsnaesKarlshamn: 3 t/day estimated with StigsnaesSödertälje: 3 t/day estimated with StigsnaesTananger: 3 t/day estimated with StigsnaesPort Jerome: 3 t/day estimated with StigsnaesFalkenberg: 3 t/day estimated with StigsnaesVästerås: 3 t/day estimated with StigsnaesMoss: 2 t/day estimated with StigsnaesCeuta: 2 t/day estimated with StigsnaesEemshaven: 2 t/day estimated with StigsnaesVarberg: 2 t/day estimated with StigsnaesFlorø: 2 t/day estimated with StigsnaesGijon: 2 t/day estimated with StigsnaesMohammedia: 2 t/day estimated with StigsnaesTallinn: 2 t/day estimated with StigsnaesSauda: 2 t/day estimated with StigsnaesThamesport: 2 t/day estimated with StigsnaesCuxhaven: 2 t/day estimated with StigsnaesGoole: 2 t/day estimated with StigsnaesSetubal: 2 t/day estimated with StigsnaesDover: 2 t/day estimated with StigsnaesSunderland: 2 t/day estimated with StigsnaesWarren Point: 1 t/day estimated with StigsnaesCadiz: 1 t/day estimated with StigsnaesIzhevskoye: 1 t/day estimated with StigsnaesHull: 1 t/day estimated with StigsnaesTurku: 1 t/day estimated with StigsnaesLarvik: 1 t/day estimated with StigsnaesOulu: 1 t/day estimated with StigsnaesBelfast: 1 t/day estimated with StigsnaesSteinkjer: 1 t/day estimated with StigsnaesHobro: 1 t/day estimated with StigsnaesCromarty: 1 t/day estimated with StigsnaesPärnu: 1 t/day estimated with StigsnaesKunda: 1 t/day estimated with StigsnaesBergen: 1 t/day estimated with StigsnaesStralsund: 1 t/day estimated with StigsnaesKotka: 1 t/day estimated with StigsnaesOdda: 1 t/day estimated with StigsnaesÅhus: 1 t/day estimated with StigsnaesFigueira Da Foz: 1 t/day estimated with StigsnaesRunavik: 1 t/day estimated with StigsnaesLuleå: 1 t/day estimated with StigsnaesMotril: 1 t/day estimated with StigsnaesTrelleborg: 0 t/day estimated with StigsnaesZeebrugge: 0 t/day estimated with StigsnaesKristiansund: 0 t/day estimated with StigsnaesMåløy: 0 t/day estimated with StigsnaesDjupviken: 0 t/day estimated with StigsnaesRonne: 0 t/day estimated with StigsnaesLandskrona: 0 t/day estimated with StigsnaesKalmar: 0 t/day estimated with StigsnaesHalden: 0 t/day estimated with StigsnaesWisbech: 0 t/day estimated with StigsnaesMethil: 0 t/day estimated with StigsnaesStigsnaes
click to enable scroll zoom · drag to pan

Full footprint: all 199 connections of Stigsnaes aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.Ust-LugaRussian Federation3.8 days between calls
  2. 2.Richards BaySouth Africa29.2 days between calls
  3. 3.MongstadNorway2.9 days between calls
  4. 4.Las Palmas (de Gran Canaria)Spain10.0 days between calls
  5. 5.RotterdamThe Netherlands5.5 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.RotterdamThe Netherlands5.6 days between calls
  2. 2.SingaporeSingapore36.7 days between calls
  3. 3.SlagentangenNorway1.2 days between calls
  4. 4.FerrolSpain5.5 days between calls
  5. 5.EsbjergDenmark1.5 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)