Port profile · Maritime Radar

Port of Cagliari daily activity

Cagliari handled an estimated average of 3.8 kt a day in the week ending 25 September 2026 (-46.1% year on year), with an average of 3 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Italy · LOCODE ITCAG · Main cargo sectors: Mineral Products, Prepared Foodstuffs & Beverages, Metals

Data up to · 25 September 2026

7-day average · Estimated total volume

3.8 kt

28-day average

3.2 kt

Vs 28-day average

+21.5%

Year on year (same week)

-46.1%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container812 kt3.9 kt
Dry bulk00 t0 t
General cargo620 kt0 t
Ro-Ro4927 kt23 kt
Tanker20 t2.8 kt

Main connections

Average daily capacity on the route · AIS 2019-2025
Livorno: 2,955 t/day estimated with CagliariLivornoSarroch Oil Terminal: 883 t/day estimated with CagliariSarroch Oil TerminalSagunto: 631 t/day estimated with CagliariSaguntoSalerno: 626 t/day estimated with CagliariSalernoGenova: 387 t/day estimated with CagliariGenovaPiraeus: 363 t/day estimated with CagliariPiraeusMarina Di Carrara: 345 t/day estimated with CagliariMarina Di CarraraAltamira: 325 t/day estimated with CagliariAltamiraGioia Tauro: 285 t/day estimated with CagliariGioia TauroPalermo: 249 t/day estimated with CagliariPalermoCivitavecchia: 222 t/day estimated with CagliariCivitavecchiaValencia: 219 t/day estimated with CagliariValenciaTangier-Mediterranean: 205 t/day estimated with CagliariTangier-MediterraneanAntwerp: 193 t/day estimated with CagliariAntwerpNapoli: 179 t/day estimated with CagliariNapoliAugusta: 163 t/day estimated with CagliariAugustaVila Do Conde: 135 t/day estimated with CagliariVila Do CondeDamietta: 133 t/day estimated with CagliariDamiettaOlbia: 132 t/day estimated with CagliariOlbiaMarsaxlokk: 124 t/day estimated with CagliariMarsaxlokkNemrut Bay: 122 t/day estimated with CagliariNemrut BayOlvia: 101 t/day estimated with CagliariOlviaBarcelona: 101 t/day estimated with CagliariBarcelonaConstantza: 98 t/day estimated with CagliariConstantzaAlgeciras: 92 t/day estimated with CagliariAlgecirasConakry: 89 t/day estimated with CagliariConakryAlexandria: 89 t/day estimated with CagliariAlexandriaGijon: 87 t/day estimated with CagliariGijonCartagena: 86 t/day estimated with CagliariCartagenaIstanbul: 80 t/day estimated with CagliariIstanbulLagos: 75 t/day estimated with CagliariLagosPorto Torres: 73 t/day estimated with CagliariPorto TorresTunis: 72 t/day estimated with CagliariTunisAbidjan: 70 t/day estimated with CagliariAbidjanGebze: 69 t/day estimated with CagliariGebzePorto Di Lido-Venezia: 67 t/day estimated with CagliariPorto Di Lido-VeneziaEl Dekheila: 67 t/day estimated with CagliariEl DekheilaHouston (US-TX): 66 t/day estimated with CagliariHouston (US-TX)Aqaba: 66 t/day estimated with CagliariAqabaYanbu (King Fahd Port): 65 t/day estimated with CagliariYanbu (King Fahd Port)Yakacik: 65 t/day estimated with CagliariYakacikHuelva: 64 t/day estimated with CagliariHuelvaRosario: 63 t/day estimated with CagliariRosarioBari: 55 t/day estimated with CagliariBariSan Pedro: 52 t/day estimated with CagliariSan PedroMontreal: 52 t/day estimated with CagliariMontrealEl Grao: 51 t/day estimated with CagliariEl GraoSfax: 51 t/day estimated with CagliariSfaxQuebec: 49 t/day estimated with CagliariQuebecSantos: 49 t/day estimated with CagliariSantosJeddah: 48 t/day estimated with CagliariJeddahRavenna: 47 t/day estimated with CagliariRavennaEleusis: 46 t/day estimated with CagliariEleusisSan Nicolas: 45 t/day estimated with CagliariSan NicolasTaranto: 45 t/day estimated with CagliariTarantoManaus: 44 t/day estimated with CagliariManausDiliskelesi: 44 t/day estimated with CagliariDiliskelesiGaeta: 43 t/day estimated with CagliariGaetaSan Martin: 42 t/day estimated with CagliariSan MartinNew Mangalore: 41 t/day estimated with CagliariNew MangaloreSplit: 41 t/day estimated with CagliariOdessa: 40 t/day estimated with CagliariSanta Marta: 39 t/day estimated with CagliariSavona: 39 t/day estimated with CagliariMurmansk: 39 t/day estimated with CagliariNew York-New Jersey: 39 t/day estimated with CagliariParanaguá: 39 t/day estimated with CagliariAnnaba: 36 t/day estimated with CagliariZonguldak: 36 t/day estimated with CagliariHamburg: 35 t/day estimated with CagliariCeuta: 34 t/day estimated with CagliariMersin: 34 t/day estimated with CagliariPuerto Cabello: 34 t/day estimated with CagliariDoha-Umm Said: 34 t/day estimated with CagliariTrapani: 33 t/day estimated with CagliariBatumi: 33 t/day estimated with CagliariTakoradi: 33 t/day estimated with CagliariBaton Rouge: 33 t/day estimated with CagliariMuhammad Bin Qasim: 32 t/day estimated with CagliariRotterdam: 31 t/day estimated with CagliariMumbai-Jawaharlal Nehru (Nhava Sheva): 31 t/day estimated with CagliariGabes: 30 t/day estimated with CagliariChornomorsk: 29 t/day estimated with CagliariAlger: 29 t/day estimated with CagliariAshdod: 28 t/day estimated with CagliariPalma de Mallorca: 28 t/day estimated with CagliariKingston: 28 t/day estimated with CagliariPort De Kribi: 28 t/day estimated with CagliariGhent: 27 t/day estimated with CagliariLas Palmas (de Gran Canaria): 27 t/day estimated with CagliariFos: 27 t/day estimated with CagliariKing Abdullah Port: 27 t/day estimated with CagliariRades (La Goulette): 27 t/day estimated with CagliariEl Sokhna: 26 t/day estimated with CagliariJacksonville: 26 t/day estimated with CagliariAncona: 26 t/day estimated with CagliariNew Orleans: 26 t/day estimated with CagliariLisboa: 26 t/day estimated with CagliariFoynes: 25 t/day estimated with CagliariKakinada: 25 t/day estimated with CagliariTarragona: 25 t/day estimated with CagliariAiyion: 25 t/day estimated with CagliariJaigad Port: 25 t/day estimated with CagliariTexas City: 24 t/day estimated with CagliariSines: 24 t/day estimated with CagliariPort Saint Louis Du Rhone: 24 t/day estimated with CagliariPiombino: 24 t/day estimated with CagliariLianyungang: 24 t/day estimated with CagliariBandirma: 24 t/day estimated with CagliariLe Havre: 23 t/day estimated with CagliariYarimca: 23 t/day estimated with CagliariThessaloníki: 23 t/day estimated with CagliariJorf Lasfar: 23 t/day estimated with CagliariJose Terminal: 23 t/day estimated with CagliariPort Said: 23 t/day estimated with CagliariToros Gubre: 22 t/day estimated with CagliariWilmington, NC: 22 t/day estimated with CagliariDakar: 22 t/day estimated with CagliariSao Francisco: 22 t/day estimated with CagliariMina Saqr: 22 t/day estimated with CagliariTaman: 21 t/day estimated with CagliariXiagong: 21 t/day estimated with CagliariPort Owendo: 21 t/day estimated with CagliariGarrucha: 21 t/day estimated with CagliariPort Arthur: 21 t/day estimated with CagliariCadiz: 20 t/day estimated with CagliariCharleston: 20 t/day estimated with CagliariBilbao: 20 t/day estimated with CagliariPhiladelphia: 20 t/day estimated with CagliariCasablanca: 20 t/day estimated with CagliariKarabiga: 19 t/day estimated with CagliariDjen Djen: 19 t/day estimated with CagliariOran: 19 t/day estimated with CagliariRas Laffan: 19 t/day estimated with CagliariFairless Hills: 19 t/day estimated with CagliariBelfast: 19 t/day estimated with CagliariKoper: 18 t/day estimated with CagliariNovorossiysk: 18 t/day estimated with CagliariPloce: 17 t/day estimated with CagliariSafi: 17 t/day estimated with CagliariGarston: 17 t/day estimated with CagliariHaina: 17 t/day estimated with CagliariMilazzo: 17 t/day estimated with CagliariLa Spezia: 17 t/day estimated with CagliariGrenaa: 16 t/day estimated with CagliariMarseille: 16 t/day estimated with CagliariPorto De Maceio: 16 t/day estimated with CagliariProgreso: 16 t/day estimated with CagliariPort Cartier: 16 t/day estimated with CagliariZarzis: 16 t/day estimated with CagliariArzew: 16 t/day estimated with CagliariTeesport: 15 t/day estimated with CagliariNewport News: 15 t/day estimated with CagliariPuerto Moin: 15 t/day estimated with CagliariMontevideo: 15 t/day estimated with CagliariBotas Natural Gas Terminal: 15 t/day estimated with CagliariTerneuzen: 15 t/day estimated with CagliariFreeport (US-FL): 14 t/day estimated with CagliariDammam: 14 t/day estimated with CagliariEemshaven: 14 t/day estimated with CagliariVisakhapatnam: 14 t/day estimated with CagliariFreeport: 14 t/day estimated with CagliariTampa Port: 14 t/day estimated with CagliariRouen: 13 t/day estimated with CagliariKandla: 13 t/day estimated with CagliariMorehead City: 13 t/day estimated with CagliariSamsun: 13 t/day estimated with CagliariPoti: 13 t/day estimated with CagliariPivdennyi: 12 t/day estimated with CagliariMtwara: 12 t/day estimated with CagliariDunkirk: 12 t/day estimated with CagliariBizerte: 12 t/day estimated with CagliariSouth Louisiana: 12 t/day estimated with CagliariLa Baie (Port Alfred): 12 t/day estimated with CagliariVado Ligure: 12 t/day estimated with CagliariSkikda (Port Methanier): 11 t/day estimated with CagliariZhanjiang: 11 t/day estimated with CagliariGuanta: 11 t/day estimated with CagliariMontoir: 10 t/day estimated with CagliariTsingéli: 10 t/day estimated with CagliariEmden: 10 t/day estimated with CagliariIzmir: 9 t/day estimated with CagliariShanghai: 9 t/day estimated with CagliariSousse: 9 t/day estimated with CagliariOristano: 9 t/day estimated with CagliariTekirdag: 9 t/day estimated with CagliariSan Ciprian: 9 t/day estimated with CagliariThamshamm: 9 t/day estimated with CagliariBayonne: 9 t/day estimated with CagliariLa Coruna: 8 t/day estimated with CagliariDurban: 8 t/day estimated with CagliariFalconara: 8 t/day estimated with CagliariJohor: 8 t/day estimated with CagliariPecem: 8 t/day estimated with CagliariFerrol: 8 t/day estimated with CagliariPuerto Barrios: 8 t/day estimated with CagliariCoatzacoalcos: 7 t/day estimated with CagliariBristol: 7 t/day estimated with CagliariMonfalcone: 7 t/day estimated with CagliariBorusan: 7 t/day estimated with CagliariCagliari
click to enable scroll zoom · drag to pan

Full footprint: all 315 connections of Cagliari aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.LivornoItaly1.0 days between calls
  2. 2.Sarroch Oil TerminalItaly1.5 days between calls
  3. 3.AltamiraMexico21.8 days between calls
  4. 4.SaguntoSpain1.3 days between calls
  5. 5.SalernoItaly0.7 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.LivornoItaly1.1 days between calls
  2. 2.Sarroch Oil TerminalItaly1.9 days between calls
  3. 3.PiraeusGreece4.1 days between calls
  4. 4.SaguntoSpain1.8 days between calls
  5. 5.SalernoItaly0.8 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)