Port profile · Maritime Radar

Port of Cagayan de Oro daily activity

Cagayan de Oro handled an estimated average of 1.6 kt a day in the week ending 25 September 2026 (-72.5% year on year), with an average of 2 port calls a day, according to IMF PortWatch AIS data. This is an estimate, not the official statistic.
Philippines · LOCODE PHCGY · Main cargo sectors: Mineral Products, Vegetable Products, Metals

Data up to · 25 September 2026

7-day average · Estimated total volume

1.6 kt

28-day average

3.3 kt

Vs 28-day average

-51.1%

Year on year (same week)

-72.5%

Estimated total volume — daily series

·

AIS estimates from IMF PortWatch; they may include transhipment and are not equivalent to the port’s official statistics.

By vessel type

Last 28 days
TypePort callsEst. importsEst. exports
Container205.3 kt1.2 kt
Dry bulk359 kt1.8 kt
General cargo269.1 kt2.1 kt
Ro-Ro21.3 kt137 t
Tanker1213 kt0 t

Main connections

Average daily capacity on the route · AIS 2019-2025
Manila: 4,628 t/day estimated with Cagayan de OroManilaCebu: 1,690 t/day estimated with Cagayan de OroCebuBatangas City: 903 t/day estimated with Cagayan de OroBatangas CityBuco: 707 t/day estimated with Cagayan de OroBucoDavao: 602 t/day estimated with Cagayan de OroDavaoSaigon: 528 t/day estimated with Cagayan de OroSaigonSingapore: 438 t/day estimated with Cagayan de OroSingaporeIloilo: 294 t/day estimated with Cagayan de OroIloiloCalaca: 292 t/day estimated with Cagayan de OroCalacaSubic Bay: 251 t/day estimated with Cagayan de OroSubic BayIligan: 243 t/day estimated with Cagayan de OroIliganVillanueva: 204 t/day estimated with Cagayan de OroVillanuevaHong Kong: 201 t/day estimated with Cagayan de OroHong KongGeneral Santos: 173 t/day estimated with Cagayan de OroGeneral SantosAberdeen: 145 t/day estimated with Cagayan de OroAberdeenShanghai: 141 t/day estimated with Cagayan de OroShanghaiKaohsiung: 120 t/day estimated with Cagayan de OroKaohsiungGaogang: 112 t/day estimated with Cagayan de OroGaogangCai Mep: 110 t/day estimated with Cagayan de OroCai MepUlsan: 95 t/day estimated with Cagayan de OroUlsanDampier: 87 t/day estimated with Cagayan de OroDampierAmlan: 87 t/day estimated with Cagayan de OroAmlanCan Tho: 83 t/day estimated with Cagayan de OroCan ThoGwangyang (Kwangyang): 82 t/day estimated with Cagayan de OroGwangyang (Kwangyang)Nasipit Port: 81 t/day estimated with Cagayan de OroNasipit PortNakhodka: 69 t/day estimated with Cagayan de OroNakhodkaGeelong: 68 t/day estimated with Cagayan de OroGeelongChiba: 67 t/day estimated with Cagayan de OroChibaJiangyin: 66 t/day estimated with Cagayan de OroJiangyinSandakan: 62 t/day estimated with Cagayan de OroSandakanTaichung: 61 t/day estimated with Cagayan de OroTaichungQingdao Port: 61 t/day estimated with Cagayan de OroQingdao PortMuara: 59 t/day estimated with Cagayan de OroMuaraBusan: 57 t/day estimated with Cagayan de OroBusanXiagong: 57 t/day estimated with Cagayan de OroXiagongTianjin Xin Gang: 54 t/day estimated with Cagayan de OroTianjin Xin GangPengerang: 52 t/day estimated with Cagayan de OroPengerangKuantan: 50 t/day estimated with Cagayan de OroKuantanSurigao City: 50 t/day estimated with Cagayan de OroSurigao CityCat Lai (Saigon New Port): 49 t/day estimated with Cagayan de OroCat Lai (Saigon New Port)Mailiao: 45 t/day estimated with Cagayan de OroMailiaoHazira: 45 t/day estimated with Cagayan de OroHaziraYangon: 43 t/day estimated with Cagayan de OroYangonVostochnyy: 43 t/day estimated with Cagayan de OroVostochnyyQinzhou: 42 t/day estimated with Cagayan de OroQinzhouMap Ta Phut: 42 t/day estimated with Cagayan de OroMap Ta PhutLanqiao Port: 40 t/day estimated with Cagayan de OroLanqiao PortJohor: 39 t/day estimated with Cagayan de OroJohorPort Hedland: 39 t/day estimated with Cagayan de OroPort HedlandBasuo: 39 t/day estimated with Cagayan de OroBasuoBayuquan: 39 t/day estimated with Cagayan de OroBayuquanKunak: 39 t/day estimated with Cagayan de OroKunakMuhammad Bin Qasim: 38 t/day estimated with Cagayan de OroMuhammad Bin QasimUmm Qasr: 38 t/day estimated with Cagayan de OroUmm QasrBalikpapan: 37 t/day estimated with Cagayan de OroBalikpapanNingbo: 36 t/day estimated with Cagayan de OroNingboBontang LNG Terminal: 36 t/day estimated with Cagayan de OroBontang LNG TerminalJeddah: 35 t/day estimated with Cagayan de OroJeddahOita: 34 t/day estimated with Cagayan de OroOitaDaesan: 34 t/day estimated with Cagayan de OroDaesanKeelung: 33 t/day estimated with Cagayan de OroSakai-Semboku: 33 t/day estimated with Cagayan de OroXiamen: 33 t/day estimated with Cagayan de OroGladstone: 31 t/day estimated with Cagayan de OroKrishnapatnam Port: 31 t/day estimated with Cagayan de OroVladivostok: 31 t/day estimated with Cagayan de OroRizhao: 30 t/day estimated with Cagayan de OroZhoushan: 29 t/day estimated with Cagayan de OroFangcheng: 28 t/day estimated with Cagayan de OroKaraikal: 27 t/day estimated with Cagayan de OroPalembang: 27 t/day estimated with Cagayan de OroYangpu: 26 t/day estimated with Cagayan de OroNew Mangalore: 25 t/day estimated with Cagayan de OroJinzhou: 25 t/day estimated with Cagayan de OroÅbenrå: 24 t/day estimated with Cagayan de OroTacoma: 24 t/day estimated with Cagayan de OroZhuhai: 24 t/day estimated with Cagayan de OroValencia: 24 t/day estimated with Cagayan de OroVisakhapatnam: 23 t/day estimated with Cagayan de OroQuequén: 23 t/day estimated with Cagayan de OroTuticorin: 22 t/day estimated with Cagayan de OroBelawan: 21 t/day estimated with Cagayan de OroRotterdam: 20 t/day estimated with Cagayan de OroPort Sudan: 20 t/day estimated with Cagayan de OroNassau: 20 t/day estimated with Cagayan de OroSydney: 20 t/day estimated with Cagayan de OroBalayan: 20 t/day estimated with Cagayan de OroDongguan: 19 t/day estimated with Cagayan de OroMizushima: 19 t/day estimated with Cagayan de OroPort Klang: 19 t/day estimated with Cagayan de OroPort of Sabah: 19 t/day estimated with Cagayan de OroNantong: 19 t/day estimated with Cagayan de OroEsperance: 19 t/day estimated with Cagayan de OroYokohama: 19 t/day estimated with Cagayan de OroSantos: 19 t/day estimated with Cagayan de OroDumai: 19 t/day estimated with Cagayan de OroPort Botany: 19 t/day estimated with Cagayan de OroHai Phong: 18 t/day estimated with Cagayan de OroBunbury: 18 t/day estimated with Cagayan de OroPuerto Princesa: 17 t/day estimated with Cagayan de OroLahad Datu: 17 t/day estimated with Cagayan de OroChittagong: 16 t/day estimated with Cagayan de OroParadip: 16 t/day estimated with Cagayan de OroHuizhou: 16 t/day estimated with Cagayan de OroMumbai-Jawaharlal Nehru (Nhava Sheva): 16 t/day estimated with Cagayan de OroDalian: 15 t/day estimated with Cagayan de OroFremantle: 15 t/day estimated with Cagayan de OroTalara: 15 t/day estimated with Cagayan de OroAqaba: 15 t/day estimated with Cagayan de OroSiam Seaport: 15 t/day estimated with Cagayan de OroHouston (US-TX): 14 t/day estimated with Cagayan de OroBrisbane: 14 t/day estimated with Cagayan de OroNanjing: 14 t/day estimated with Cagayan de OroTauranga: 14 t/day estimated with Cagayan de OroRosario: 14 t/day estimated with Cagayan de OroKandla: 14 t/day estimated with Cagayan de OroSurabaya: 14 t/day estimated with Cagayan de OroJimenez, Ozamis: 14 t/day estimated with Cagayan de OroNewcastle: 14 t/day estimated with Cagayan de OroChiwan: 13 t/day estimated with Cagayan de OroLobito: 13 t/day estimated with Cagayan de OroQuanzhou: 13 t/day estimated with Cagayan de OroJiaxing: 13 t/day estimated with Cagayan de OroDung Quat: 12 t/day estimated with Cagayan de OroSuzhou (Zhangjiagang): 12 t/day estimated with Cagayan de OroHon Gai: 12 t/day estimated with Cagayan de OroTaipei: 12 t/day estimated with Cagayan de OroCam Pha: 12 t/day estimated with Cagayan de OroKavieng Harbor: 11 t/day estimated with Cagayan de OroVancouver: 11 t/day estimated with Cagayan de OroDoha-Umm Said: 11 t/day estimated with Cagayan de OroSuzhou (Taicang): 11 t/day estimated with Cagayan de OroQuy Nhon: 11 t/day estimated with Cagayan de OroPort of Sohar: 11 t/day estimated with Cagayan de OroGuangxi Beibu Gulf Port: 11 t/day estimated with Cagayan de OroMikawa: 11 t/day estimated with Cagayan de OroBintulu: 10 t/day estimated with Cagayan de OroBangkok: 10 t/day estimated with Cagayan de OroIndonesia Morowali Industrial Park: 10 t/day estimated with Cagayan de OroKemaman Harbor: 10 t/day estimated with Cagayan de OroChaozhou: 10 t/day estimated with Cagayan de OroNghe Tinh: 10 t/day estimated with Cagayan de OroTokyo: 9 t/day estimated with Cagayan de OroShougang Jingtang: 9 t/day estimated with Cagayan de OroJebel Ali: 9 t/day estimated with Cagayan de OroNagoya: 9 t/day estimated with Cagayan de OroMakassar: 9 t/day estimated with Cagayan de OroSongkhla: 9 t/day estimated with Cagayan de OroPanjang: 9 t/day estimated with Cagayan de OroZamboanga: 8 t/day estimated with Cagayan de OroIsabel: 8 t/day estimated with Cagayan de OroKuala Tanjung: 7 t/day estimated with Cagayan de OroGuangdong Yangjiang Port: 7 t/day estimated with Cagayan de OroBitung: 7 t/day estimated with Cagayan de OroOrmoc: 7 t/day estimated with Cagayan de OroZhanjiang: 7 t/day estimated with Cagayan de OroKimbe: 6 t/day estimated with Cagayan de OroGuangzhou (Nansha): 6 t/day estimated with Cagayan de OroShekou (Shenzhen): 6 t/day estimated with Cagayan de OroTanjung Priok: 6 t/day estimated with Cagayan de OroMawan: 6 t/day estimated with Cagayan de OroEl Sokhna: 5 t/day estimated with Cagayan de OroGresik: 5 t/day estimated with Cagayan de OroXiuyu: 5 t/day estimated with Cagayan de OroPenang: 4 t/day estimated with Cagayan de OroPLTU Semen Tonasa: 4 t/day estimated with Cagayan de OroChennai (Madras): 4 t/day estimated with Cagayan de OroColombo: 4 t/day estimated with Cagayan de OroTanjunguban: 4 t/day estimated with Cagayan de OroLianyungang: 3 t/day estimated with Cagayan de OroShanghai (Yangshan): 3 t/day estimated with Cagayan de OroLuoyuan: 3 t/day estimated with Cagayan de OroVanimo: 3 t/day estimated with Cagayan de OroTanjung Sekong: 3 t/day estimated with Cagayan de OroDa Nang: 3 t/day estimated with Cagayan de OroPontianak: 3 t/day estimated with Cagayan de OroBeihai: 3 t/day estimated with Cagayan de OroZhapu: 2 t/day estimated with Cagayan de OroKupang: 2 t/day estimated with Cagayan de OroFuzhou: 2 t/day estimated with Cagayan de OroLaem Chabang: 2 t/day estimated with Cagayan de OroKendari: 2 t/day estimated with Cagayan de OroPortland: 2 t/day estimated with Cagayan de OroSuao: 2 t/day estimated with Cagayan de OroKâmpóng Saôm: 2 t/day estimated with Cagayan de OroGourd Shanzui: 2 t/day estimated with Cagayan de OroKota Kinabalu: 2 t/day estimated with Cagayan de OroMasao: 2 t/day estimated with Cagayan de OroOnahama: 2 t/day estimated with Cagayan de OroPomalaa: 2 t/day estimated with Cagayan de OroKota Baru: 2 t/day estimated with Cagayan de OroManokwari Road: 2 t/day estimated with Cagayan de OroLumut: 2 t/day estimated with Cagayan de OroMadang: 1 t/day estimated with Cagayan de OroStagen: 1 t/day estimated with Cagayan de OroSerangoon Harbor: 1 t/day estimated with Cagayan de OroKobe: 1 t/day estimated with Cagayan de OroSampit: 1 t/day estimated with Cagayan de OroTawau: 1 t/day estimated with Cagayan de OroSamarinda: 1 t/day estimated with Cagayan de OroCagayan de Oro
click to enable scroll zoom · drag to pan

Full footprint: all 210 connections of Cagayan de Oro aggregated over the SeaRoute (Eurostat) shipping lanes — each segment glows according to the estimated capacity it carries (IMF PortWatch, AIS 2019-2025).

Where vessels arrive from

Ports of origin (upstream)

  1. 1.ManilaPhilippines3.5 days between calls
  2. 2.CebuPhilippines2.7 days between calls
  3. 3.Batangas CityPhilippines6.8 days between calls
  4. 4.BucoPhilippines0.8 days between calls
  5. 5.SaigonVietnam10.0 days between calls

Where they sail on to

Destination ports (downstream)

  1. 1.ManilaPhilippines3.8 days between calls
  2. 2.CebuPhilippines4.2 days between calls
  3. 3.Batangas CityPhilippines5.4 days between calls
  4. 4.DavaoPhilippines17.1 days between calls
  5. 5.BucoPhilippines6.3 days between calls

IMF connection network based on vessel capacity before and after calling at this port (AIS 2019-2025). The time shown is the average elapsed between the call at one port and the next call at the other — it includes anchorage and berthing waits, which is why it far exceeds pure sailing time on short routes such as Algeciras–Tanger Med.

Indicators · EED Data

Read the monthly summary

All indicators →
NEXT TOTAL SOLAR ECLIPSEAugust 2, 2027

Totality returns to the Strait of Gibraltar

In less than a year, the Moon's shadow will sweep across southern Spain with over 4 minutes of total darkness over Algeciras, Tarifa, and Gibraltar.

---Days
--Hours
--Mins
--Secs
Explore Eclipse Special (in Spanish)